REFERENCE / FLOW-01
See how a lead-intake workflow should be tested.
This is a reference architecture and proposed test plan—not a live production demonstration. It describes the behaviors to define and verify before any workflow is presented as proven.
This page shows a conceptual path and test scenarios. Each scenario is marked as planned until it is genuinely run in a dedicated test environment and supported by real evidence.
Workflow map / lead-to-CRM
From incoming event to next action.
PROPOSED TEST PLAN
Six scenarios worth naming before delivery.
The expected outcome must be agreed before a test is run. After execution, record the actual result, evidence timestamp/version, and any limitations. The cards below are planned scenarios—not pass results.
Happy path
Submit a valid synthetic lead through the defined intake route.
Repeated event
Send the same event identifier or equivalent repeat twice.
Missing or malformed input
Remove a required field or send a format outside the accepted contract.
Destination API failure
Use a controlled test failure to exercise the defined error path.
Timeout and retry
Exercise timeout behavior if retry logic is part of the implementation.
Recovery verification
Resume a deliberately failed test item using the agreed recovery method.
WHAT EVIDENCE SHOULD CONTAIN
Make the test report useful to the next person.
When a real test environment exists, evidence should be specific enough for a reviewer to understand the version, conditions, output, and limitations without exposing client data or secrets.
Per-scenario record
- ✓Scenario identifier and setup.
- ✓Expected behavior written before execution.
- ✓Observed result and status after execution.
- ✓Evidence timestamp, version, and redacted screenshots/logs when available.
Explicit limitations
- ✓Scenarios not run and conditions not covered.
- ✓Plan or API constraints that shaped the test.
- ✓Which retries, queues, alerts, or recovery actions actually exist.
- ✓Synthetic data only; no exposed tokens or client records.
scenario: "T-01 / happy path",
status: "Not run — reference plan",
observed_result: null,
evidence_timestamp: null,
note: "Populate only from a genuine test run."
}
INTERESTED IN A SIMILAR FLOW?
Start with the actual systems and intended outcome.
Describe where the data starts, where it needs to go, and what should happen next. Fit and compatibility are checked during scoping.